{"product_id":"rheem-315l-dual-electric-s-e-2x3-6kw-3hr","title":"Rheem 315L Twin Element Electric Hot Water System | 3 Hour Free Power Controlled Ready Setup","description":"\u003ch1\u003eRheem 315L Twin Element Electric Water Heater 3HR Ready Installation in Brisbane \u0026amp; Gold Coast\u003c\/h1\u003e\n\u003cp\u003eThe Rheem 315L Twin Element Electric Water Heater is a large-capacity electric storage hot water system now available as a JR Gas \u0026amp; Water 3HR Ready installation package for Brisbane, Gold Coast and South East Queensland homes preparing for the 3 hour free power window.\u003c\/p\u003e\n\u003cp\u003eThis setup is designed for households that want more than a standard electric hot water replacement. Every JR 3HR Ready installation includes Catch Power integration, dual-circuit hot water control, manual bypass functionality and solar-ready integration to help the system heat during the preferred daytime power window, support heavier household demand and make better use of available solar where suitable.\u003c\/p\u003e\n\u003cp\u003eWith 315 litres of storage capacity and a twin element configuration, this system is a strong option for larger families, higher-use homes and properties that need reliable stored hot water with smarter control for the way electricity use is changing.\u003c\/p\u003e\n\u003ch2\u003eWhat Is the Rheem 315L 3HR Ready Hot Water System?\u003c\/h2\u003e\n\u003cp\u003eThe Rheem 315L Twin Element Electric Water Heater is a large electric storage hot water system designed for homes that need a higher volume of stored hot water than smaller residential tanks can usually provide.\u003c\/p\u003e\n\u003cp\u003eThe JR 3HR Ready version takes this twin element electric storage system and pairs it with Catch Power integration, dual-circuit control, manual bypass functionality and solar integration. This allows the system to be configured around the 3 hour free power period instead of operating like a basic electric tank replacement.\u003c\/p\u003e\n\u003cp\u003eThe twin element design supports stronger recovery than a standard single element setup, while the 315L tank provides a larger stored hot water buffer for evening and morning use after the preferred daytime heating period.\u003c\/p\u003e\n\u003ch2\u003eWhy Choose the Rheem 315L 3HR Ready Package?\u003c\/h2\u003e\n\u003cp\u003eThe Rheem 315L 3HR Ready package is designed for homeowners who want a large-capacity electric hot water replacement that is ready for free daytime electricity, solar integration and smarter control.\u003c\/p\u003e\n\u003cp\u003eThis setup suits homes that want to:\u003c\/p\u003e\n\u003cp\u003euse more hot water heating during the 3 hour free power window\u003c\/p\u003e\n\u003cp\u003eprepare for free daytime electricity plans\u003c\/p\u003e\n\u003cp\u003estore more hot water for evening and morning use\u003c\/p\u003e\n\u003cp\u003eintegrate hot water with solar where suitable\u003c\/p\u003e\n\u003cp\u003eimprove control over when the system heats\u003c\/p\u003e\n\u003cp\u003ekeep the familiar reliability of electric storage hot water\u003c\/p\u003e\n\u003cp\u003esupport higher household demand with dual-circuit control\u003c\/p\u003e\n\u003cp\u003eallow manual bypass when extra heating is required\u003c\/p\u003e\n\u003cp\u003emonitor hot water operation remotely through Catch Power\u003c\/p\u003e\n\u003cp\u003eFor many higher-use homes, the 315L size provides a better stored hot water buffer than smaller tanks when the goal is to heat during a set daytime window and carry that hot water into the rest of the day.\u003c\/p\u003e\n\u003ch2\u003eCatch Power Integration Included\u003c\/h2\u003e\n\u003cp\u003eEvery JR 3HR Ready installation includes Catch Power integration as part of the setup.\u003c\/p\u003e\n\u003cp\u003eCatch Power control helps manage when the hot water system runs, making it easier to align water heating with preferred electricity periods, solar production and the 3 hour free power window where available through your electricity plan.\u003c\/p\u003e\n\u003cp\u003eCatch Power integration can help with:\u003c\/p\u003e\n\u003cp\u003etiming hot water heating during the free daytime power period\u003c\/p\u003e\n\u003cp\u003emaking better use of solar energy where available\u003c\/p\u003e\n\u003cp\u003ereducing unnecessary heating at the wrong time of day\u003c\/p\u003e\n\u003cp\u003esupporting remote monitoring of hot water performance\u003c\/p\u003e\n\u003cp\u003egiving better visibility over when the system is heating\u003c\/p\u003e\n\u003cp\u003ecreating a smarter hot water setup than a standard tank replacement\u003c\/p\u003e\n\u003cp\u003eThe goal is to give your hot water system better timing, better visibility and better control.\u003c\/p\u003e\n\u003ch2\u003eDual-Circuit Integration for 3 Hour Free Power Performance\u003c\/h2\u003e\n\u003cp\u003eA key part of the JR 3HR Ready setup is dual-circuit integration.\u003c\/p\u003e\n\u003cp\u003eThis dual integration allows the system to reheat within the 3 hour free power period where suitable, while also allowing solar integration or additional heating support when demand is high or required.\u003c\/p\u003e\n\u003cp\u003eThat matters because real hot water usage changes from day to day. Some days the household may use more hot water than expected. Some homes have heavy evening shower demand. Some properties may want to prioritise solar during the day, then allow backup heating if the tank needs extra recovery.\u003c\/p\u003e\n\u003cp\u003eThe dual-circuit setup helps support that flexibility while still keeping the system focused on using the best available power window.\u003c\/p\u003e\n\u003ch2\u003eManual Bypass Included\u003c\/h2\u003e\n\u003cp\u003eEvery JR 3HR Ready installation also includes manual bypass functionality.\u003c\/p\u003e\n\u003cp\u003eThe manual bypass gives the household a practical backup option. If hot water demand is higher than expected, or if the system needs to heat outside the normal preferred window, the bypass allows additional control rather than locking the home into one rigid operating schedule.\u003c\/p\u003e\n\u003cp\u003eThis is especially useful for larger families, rental properties, high-use homes and households where hot water demand is not the same every day.\u003c\/p\u003e\n\u003ch2\u003eSolar Integration Ready\u003c\/h2\u003e\n\u003cp\u003eThe Rheem 315L 3HR Ready package is designed to support solar integration where suitable.\u003c\/p\u003e\n\u003cp\u003eFor homes with solar PV, this allows the hot water system to be set up to better align with daytime solar production. Instead of exporting excess solar for a lower return, the system can be configured to help turn available daytime energy into stored hot water.\u003c\/p\u003e\n\u003cp\u003eThe Catch Power and dual-circuit setup can help prioritise daytime heating while still allowing additional heating support when household demand is high or required.\u003c\/p\u003e\n\u003ch2\u003eRemote Monitoring Benefits\u003c\/h2\u003e\n\u003cp\u003eWith Catch Power integration, remote monitoring can give homeowners better visibility over how their hot water system is operating.\u003c\/p\u003e\n\u003cp\u003eRemote monitoring can help show when the system is heating, how the setup is responding to available power and whether the hot water strategy is working as intended.\u003c\/p\u003e\n\u003cp\u003eFor 3HR Ready installations, this is valuable because the system is not just being installed as a standard electric tank. It is being set up around timing, control, solar integration and free power readiness.\u003c\/p\u003e\n\u003ch2\u003eWhy the 315L Size Works Well for 3HR Ready Hot Water\u003c\/h2\u003e\n\u003cp\u003eTank size matters more when the goal is to heat water during a specific free power window.\u003c\/p\u003e\n\u003cp\u003eThe Rheem 315L Twin Element Electric Water Heater provides a larger stored hot water volume, which can help carry the household through evening and morning usage after the system has heated during the preferred daytime period.\u003c\/p\u003e\n\u003cp\u003eThis can be useful for:\u003c\/p\u003e\n\u003cp\u003elarger families\u003c\/p\u003e\n\u003cp\u003ehomes with multiple bathrooms\u003c\/p\u003e\n\u003cp\u003eproperties with heavier evening shower demand\u003c\/p\u003e\n\u003cp\u003ehouseholds wanting more stored hot water buffer\u003c\/p\u003e\n\u003cp\u003ehomes preparing for 3 hour free power plans\u003c\/p\u003e\n\u003cp\u003eproperties wanting solar-integrated hot water storage\u003c\/p\u003e\n\u003cp\u003eThe right size still depends on the household, but the 315L model is a strong option when stored volume and recovery flexibility matter.\u003c\/p\u003e\n\u003ch2\u003eIs the Rheem 315L 3HR Ready System Right for Your Home?\u003c\/h2\u003e\n\u003cp\u003eThe Rheem 315L 3HR Ready setup is best suited to homes that want a large-capacity electric storage hot water system with smarter control.\u003c\/p\u003e\n\u003cp\u003eIt may be a strong fit if:\u003c\/p\u003e\n\u003cp\u003eyou are replacing an existing large electric hot water system\u003c\/p\u003e\n\u003cp\u003eyou want to prepare for 3 hour free power\u003c\/p\u003e\n\u003cp\u003eyou have higher household hot water demand\u003c\/p\u003e\n\u003cp\u003eyou want a twin element electric storage system\u003c\/p\u003e\n\u003cp\u003eyou have solar or want to make better use of daytime power\u003c\/p\u003e\n\u003cp\u003eyou want Catch Power control included\u003c\/p\u003e\n\u003cp\u003eyou want remote monitoring capability\u003c\/p\u003e\n\u003cp\u003eyou want manual bypass for backup operation\u003c\/p\u003e\n\u003cp\u003eyou need more stored hot water than a smaller tank can provide\u003c\/p\u003e\n\u003cp\u003eThis system is especially relevant for South East Queensland homes that want a familiar electric storage replacement with better control for free daytime power and solar integration.\u003c\/p\u003e\n\u003ch2\u003eWhy Choose a 3HR Ready Electric Storage System Instead of a Basic Replacement?\u003c\/h2\u003e\n\u003cp\u003eA basic electric hot water replacement usually focuses on replacing the old tank with a new one.\u003c\/p\u003e\n\u003cp\u003eA 3HR Ready replacement goes further.\u003c\/p\u003e\n\u003cp\u003eIt considers when the system heats, how it uses free daytime power, whether solar integration is suitable, how the home manages high-demand periods and whether the setup has practical backup control.\u003c\/p\u003e\n\u003cp\u003eThat matters because a standard electric replacement may still heat at the wrong time of day. If the system is not controlled properly, the household may miss the opportunity to use the 3 hour free power window effectively.\u003c\/p\u003e\n\u003cp\u003eThe JR 3HR Ready setup is designed to help the home use smarter timing, better control and stronger visibility over hot water operation.\u003c\/p\u003e\n\u003ch2\u003eWhat’s Included in the JR 3HR Ready Installation Package?\u003c\/h2\u003e\n\u003cp\u003eThe installation scope depends on the selected package and site conditions, but the Rheem 315L 3HR Ready installation is designed as a comprehensive hot water replacement and control upgrade.\u003c\/p\u003e\n\u003cp\u003eThe package may include:\u003c\/p\u003e\n\u003cp\u003eRheem 315L Twin Element Electric Water Heater\u003c\/p\u003e\n\u003cp\u003eCatch Power integration\u003c\/p\u003e\n\u003cp\u003edual-circuit hot water control\u003c\/p\u003e\n\u003cp\u003emanual bypass setup\u003c\/p\u003e\n\u003cp\u003esolar integration pathway\u003c\/p\u003e\n\u003cp\u003eremote monitoring capability\u003c\/p\u003e\n\u003cp\u003eelectrical disconnect and reconnect\u003c\/p\u003e\n\u003cp\u003enew valves where required\u003c\/p\u003e\n\u003cp\u003eupgraded pipework where required\u003c\/p\u003e\n\u003cp\u003edrain line improvements where required\u003c\/p\u003e\n\u003cp\u003epipe insulation\u003c\/p\u003e\n\u003cp\u003eForm 4 compliance documentation\u003c\/p\u003e\n\u003cp\u003esystem commissioning\u003c\/p\u003e\n\u003cp\u003eold system disposal\u003c\/p\u003e\n\u003cp\u003esupport base where included in the selected package\u003c\/p\u003e\n\u003cp\u003eFinal installation requirements depend on the existing hot water system, electrical setup, plumbing layout, access, switchboard suitability and whether extra works are needed for a safe and compliant installation.\u003c\/p\u003e\n\u003ch2\u003eProfessional Rheem 315L 3HR Ready Installation in Brisbane \u0026amp; Gold Coast\u003c\/h2\u003e\n\u003cp\u003eJR Gas \u0026amp; Water supplies and installs Rheem 315L 3HR Ready hot water systems across Brisbane, Gold Coast and South East Queensland.\u003c\/p\u003e\n\u003cp\u003eWe service areas including:\u003c\/p\u003e\n\u003cp\u003eBrisbane\u003c\/p\u003e\n\u003cp\u003eGold Coast\u003c\/p\u003e\n\u003cp\u003eLogan\u003c\/p\u003e\n\u003cp\u003eIpswich\u003c\/p\u003e\n\u003cp\u003eRedlands\u003c\/p\u003e\n\u003cp\u003eMoreton Bay\u003c\/p\u003e\n\u003cp\u003eScenic Rim\u003c\/p\u003e\n\u003cp\u003esurrounding South East Queensland suburbs\u003c\/p\u003e\n\u003cp\u003eOur approach is installation-led. That means we assess the existing system, household hot water demand, available space, plumbing layout, electrical requirements, solar suitability and control setup before recommending the right package.\u003c\/p\u003e\n\u003cp\u003eThe aim is to give the home a reliable large-capacity electric storage hot water system that is also ready to make better use of the 3 hour free power window.\u003c\/p\u003e\n\u003ch2\u003eWhy Choose JR Gas \u0026amp; Water?\u003c\/h2\u003e\n\u003cp\u003eJR Gas \u0026amp; Water specialises in practical hot water system replacements, upgrades and energy-aware installation setups across Brisbane, Gold Coast and South East Queensland.\u003c\/p\u003e\n\u003cp\u003eFor 3HR Ready installations, we focus on more than just the tank. We look at the full system, including the product, plumbing, electrical control, Catch Power integration, solar compatibility, remote monitoring and backup operation.\u003c\/p\u003e\n\u003cp\u003eCustomers choose JR Gas \u0026amp; Water for:\u003c\/p\u003e\n\u003cp\u003elicensed hot water installation\u003c\/p\u003e\n\u003cp\u003e3HR Ready electric hot water packages\u003c\/p\u003e\n\u003cp\u003eCatch Power integration included\u003c\/p\u003e\n\u003cp\u003edual-circuit hot water control\u003c\/p\u003e\n\u003cp\u003emanual bypass functionality\u003c\/p\u003e\n\u003cp\u003esolar integration options\u003c\/p\u003e\n\u003cp\u003eremote monitoring capability\u003c\/p\u003e\n\u003cp\u003elarge-capacity electric storage options\u003c\/p\u003e\n\u003cp\u003eadvice based on the actual property\u003c\/p\u003e\n\u003cp\u003eBrisbane and Gold Coast service coverage\u003c\/p\u003e\n\u003cp\u003eclear installation scope and package options\u003c\/p\u003e\n\u003cp\u003eThe result is a smarter hot water replacement designed for the way homes will use power moving forward.\u003c\/p\u003e\n\u003ch2\u003eRheem 315L 3HR Ready Installation FAQs\u003c\/h2\u003e\n\u003ch3\u003eWhat makes this system 3HR Ready?\u003c\/h3\u003e\n\u003cp\u003eThe JR 3HR Ready setup includes Catch Power integration, dual-circuit control, manual bypass functionality, solar integration and remote monitoring capability. This allows the system to be configured to prioritise heating during the 3 hour free power period where suitable, while still allowing backup operation when required.\u003c\/p\u003e\n\u003ch3\u003eDoes this installation include Catch Power control?\u003c\/h3\u003e\n\u003cp\u003eYes. All JR 3HR Ready installations include Catch Power integration as part of the package. This helps manage hot water heating times, support solar integration and provide better visibility through remote monitoring.\u003c\/p\u003e\n\u003ch3\u003eWhat is dual-circuit integration?\u003c\/h3\u003e\n\u003cp\u003eDual-circuit integration gives the system a more flexible heating setup than a standard single supply arrangement. It allows the system to reheat during the 3 hour free power window where suitable, while still supporting solar integration or additional heating when demand is high or backup operation is needed.\u003c\/p\u003e\n\u003ch3\u003eWhy is manual bypass included?\u003c\/h3\u003e\n\u003cp\u003eManual bypass is included so the household has a practical backup option. If hot water demand is higher than expected or heating is required outside the normal control period, the bypass gives added flexibility.\u003c\/p\u003e\n\u003ch3\u003eCan this system work with solar?\u003c\/h3\u003e\n\u003cp\u003eYes. The 3HR Ready setup is designed to support solar integration where suitable. This can help the home make better use of daytime solar production and reduce reliance on paid electricity where the setup and usage pattern allow.\u003c\/p\u003e\n\u003ch3\u003eDoes remote monitoring come with the setup?\u003c\/h3\u003e\n\u003cp\u003eThe Catch Power integration supports remote monitoring capability, giving better visibility over how the hot water system is operating and when it is heating.\u003c\/p\u003e\n\u003ch3\u003eIs the 315L size good for 3 hour free power?\u003c\/h3\u003e\n\u003cp\u003eThe 315L size can be a strong option for larger households because it stores more hot water after the daytime heating period. This can help carry the household through evening and morning use, depending on demand, tank settings and usage patterns.\u003c\/p\u003e\n\u003ch3\u003eIs this better than a standard electric hot water replacement?\u003c\/h3\u003e\n\u003cp\u003eFor homes preparing for 3 hour free power or wanting better control over daytime heating, yes. A standard replacement may still provide hot water, but it does not offer the same Catch Power integration, dual-circuit control, manual bypass, solar integration or remote monitoring benefits.\u003c\/p\u003e\n\u003ch3\u003eCan this replace my current electric hot water system?\u003c\/h3\u003e\n\u003cp\u003eIn many cases, yes. It is especially suited to homes replacing an existing large electric storage system. Final suitability depends on available space, plumbing layout, electrical setup, switchboard capacity, water pressure conditions and access.\u003c\/p\u003e\n\u003ch3\u003eCan JR Gas \u0026amp; Water install this in Brisbane or the Gold Coast?\u003c\/h3\u003e\n\u003cp\u003eYes. JR Gas \u0026amp; Water installs 3HR Ready hot water systems across Brisbane, Gold Coast, Logan, Ipswich, Redlands, Moreton Bay, Scenic Rim and surrounding South East Queensland areas.\u003c\/p\u003e","brand":"JR Gas and Water","offers":[{"title":"Gold 3HR Plus – Dual Element Replacement – Comprehensive System Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Priority-Saver Insta","offer_id":45662411718847,"sku":null,"price":4499.0,"currency_code":"AUD","in_stock":true},{"title":"Gold 3HR Plus – Dual Element Replacement – Comprehensive System Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Express Install (max","offer_id":45662411751615,"sku":null,"price":4699.0,"currency_code":"AUD","in_stock":true},{"title":"Gold 3HR Plus – Dual Element Replacement – Comprehensive System Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Same-Day Install (Mo","offer_id":45662411784383,"sku":null,"price":4899.0,"currency_code":"AUD","in_stock":false},{"title":"Gold 3HR Plus – Dual Element Replacement – Comprehensive System Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Saturday Install","offer_id":45662411817151,"sku":null,"price":5099.0,"currency_code":"AUD","in_stock":false},{"title":"Gold 3HR Plus – Dual Element Replacement – Comprehensive System Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Sunday\/Public Holida","offer_id":45662411849919,"sku":null,"price":5299.0,"currency_code":"AUD","in_stock":false},{"title":"Sapphire 3HR Plus – Single Element Replacement – Comprehensive Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, upgraded circuit, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Pri","offer_id":45662411882687,"sku":null,"price":5049.0,"currency_code":"AUD","in_stock":true},{"title":"Sapphire 3HR Plus – Single Element Replacement – Comprehensive Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, upgraded circuit, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Exp","offer_id":45662411915455,"sku":null,"price":5099.0,"currency_code":"AUD","in_stock":true},{"title":"Sapphire 3HR Plus – Single Element Replacement – Comprehensive Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, upgraded circuit, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Sam","offer_id":45662411948223,"sku":null,"price":5299.0,"currency_code":"AUD","in_stock":false},{"title":"Sapphire 3HR Plus – Single Element Replacement – Comprehensive Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, upgraded circuit, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Sat","offer_id":45662411980991,"sku":null,"price":5499.0,"currency_code":"AUD","in_stock":false},{"title":"Sapphire 3HR Plus – Single Element Replacement – Comprehensive Replacement + 3hr Free Power\/Solar Integration – Inc. Form 4, upgraded circuit, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Sun","offer_id":45662412013759,"sku":null,"price":5699.0,"currency_code":"AUD","in_stock":false},{"title":"Diamond 3HR Plus – Gas System Replacement – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, new dual circuits, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Priority-Saver In","offer_id":45662412046527,"sku":null,"price":5299.0,"currency_code":"AUD","in_stock":true},{"title":"Diamond 3HR Plus – Gas System Replacement – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, new dual circuits, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Express Install (","offer_id":45662412079295,"sku":null,"price":5299.0,"currency_code":"AUD","in_stock":true},{"title":"Diamond 3HR Plus – Gas System Replacement – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, new dual circuits, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Same-Day Install ","offer_id":45662412112063,"sku":null,"price":5499.0,"currency_code":"AUD","in_stock":false},{"title":"Diamond 3HR Plus – Gas System Replacement – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, new dual circuits, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Saturday Install","offer_id":45662412144831,"sku":null,"price":5699.0,"currency_code":"AUD","in_stock":false},{"title":"Diamond 3HR Plus – Gas System Replacement – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, new dual circuits, Catch Power control, solar integration, power bypass, new valves, upgraded pipework + FREE base \u0026 disposal \/ Sunday\/Public Hol","offer_id":45662412177599,"sku":null,"price":5899.0,"currency_code":"AUD","in_stock":false},{"title":"Platinum 3HR Plus – Any System Replacement + Relocation – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, 20m relocated pipework, new dual circuits, Catch Power control, solar integration, power bypass, new valves + FREE base \u0026 disposal ","offer_id":45662412210367,"sku":null,"price":5849.0,"currency_code":"AUD","in_stock":true},{"title":"Platinum 3HR Plus – Any System Replacement + Relocation – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, 20m relocated pipework, new dual circuits, Catch Power control, solar integration, power bypass, new valves + FREE base \u0026 disposal ","offer_id":45662412243135,"sku":null,"price":5799.0,"currency_code":"AUD","in_stock":true},{"title":"Platinum 3HR Plus – Any System Replacement + Relocation – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, 20m relocated pipework, new dual circuits, Catch Power control, solar integration, power bypass, new valves + FREE base \u0026 disposal ","offer_id":45662412275903,"sku":null,"price":5999.0,"currency_code":"AUD","in_stock":false},{"title":"Platinum 3HR Plus – Any System Replacement + Relocation – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, 20m relocated pipework, new dual circuits, Catch Power control, solar integration, power bypass, new valves + FREE base \u0026 disposal ","offer_id":45662412308671,"sku":null,"price":6199.0,"currency_code":"AUD","in_stock":false},{"title":"Platinum 3HR Plus – Any System Replacement + Relocation – Full System Upgrade + New Dual Electrical Circuits – Inc. Form 4, 20m relocated pipework, new dual circuits, Catch Power control, solar integration, power bypass, new valves + FREE base \u0026 disposal ","offer_id":45662412341439,"sku":null,"price":6399.0,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0049\/3168\/2415\/files\/rheem-315l-twin-element-electric-hot-water-system-3-hour-free-power-controlled-ready-setupwater-heater-electric-2719387.jpg?v=1779935646","url":"https:\/\/www.jrgasandwater.com.au\/products\/rheem-315l-dual-electric-s-e-2x3-6kw-3hr","provider":"JR Gas and Water","version":"1.0","type":"link"}