{"product_id":"fridge-water-line-installation-connection","title":"Fridge Water Line Installation \u0026 Connection","description":"\u003ch1\u003eFridge Water Line Installation — Brisbane \u0026amp; Gold Coast\u003c\/h1\u003e\n\u003cp\u003eNeed a water connection installed for a new plumbed fridge, ice maker or chilled water dispenser? JR Gas \u0026amp; Water provides professional \u003cstrong\u003efridge water line installation and connection services\u003c\/strong\u003e across Brisbane and the Gold Coast with clear installation options based on how the water needs to reach your fridge.\u003c\/p\u003e\n\u003cp\u003eChoose the option that best matches your existing plumbing, select your preferred booking timeframe and book your service online.\u003c\/p\u003e\n\u003cp\u003eThis service is for \u003cstrong\u003ecustomer-supplied refrigerators\u003c\/strong\u003e.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch2\u003eChoose Your Fridge Water Installation\u003c\/h2\u003e\n\u003ch3\u003e1. Existing Fridge Water Point — Connection Only\u003c\/h3\u003e\n\u003cp\u003eFor properties where a suitable fridge water point has already been installed and the new fridge simply needs to be connected.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIncludes:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eConnection of customer-supplied plumbed fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to existing accessible fridge water point\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eCheck existing isolation valve\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStandard connection fittings where required\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater supply turned on and tested\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLeak testing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic fridge water\/ice supply check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBest for:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eReplacing an existing plumbed fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNew fridge where the water point is already installed\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eExisting compliant connection directly behind or beside the fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStraightforward fridge replacement\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003e2. New Water Line — From Sink on Same Cupboard Run\u003c\/h3\u003e\n\u003cp\u003eFor kitchens where the fridge is located along the \u003cstrong\u003esame continuous cupboard run as the kitchen sink\u003c\/strong\u003e and a new water line can be routed through the cabinetry without crossing an island, doorway or open floor area.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIncludes:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to suitable existing cold water supply beneath sink\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDedicated fridge isolation valve\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNew fridge water line through accessible cupboards\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStandard drilling through timber\/laminate cabinetry where required\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to customer-supplied fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater pressure and flow check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLeak testing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic fridge water\/ice supply check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBest for:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eFridge beside or near the kitchen sink\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eContinuous cabinetry between sink and fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStraightforward water line through cupboards\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eKitchens without an island between the sink and fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003e3. New Water Line — Extended Cabinet \/ Wall Route\u003c\/h3\u003e\n\u003cp\u003eFor kitchens where the fridge is further away from the sink but the new water line can still be installed through accessible cabinetry, walls or another practical internal route without entering the ceiling space.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIncludes:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to suitable existing cold water supply\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDedicated fridge isolation valve\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNew water line routed through accessible cabinetry or suitable wall areas\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStandard timber\/laminate penetrations where required\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to customer-supplied fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater pressure and flow check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLeak testing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic fridge water\/ice supply check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBest for:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eFridge positioned several cupboards away from the sink\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eL-shaped or U-shaped kitchens\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLonger cabinetry runs\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eInstallations where a direct cupboard route remains accessible\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003e4. New Water Line — Through Ceiling Space\u003c\/h3\u003e\n\u003cp\u003eFor properties where there is no practical cabinetry route and the fridge water supply needs to be taken \u003cstrong\u003eup into the ceiling space and dropped back down near the fridge location\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIncludes:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to suitable existing cold water supply\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDedicated fridge isolation valve\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNew water line routed through accessible ceiling space\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003ePipework secured through accessible areas\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWall or cupboard entry near fridge where practical\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection to customer-supplied fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater pressure and flow check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLeak testing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic fridge water\/ice supply check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBest for:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eFridge located on the opposite side of the kitchen\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNo continuous cupboard route available\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eKitchens separated by doorways or open areas\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eHomes with suitable accessible ceiling space\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eInstallations requiring the water line to cross above the kitchen\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003e5. Complex Fridge Water Line Installation\u003c\/h3\u003e\n\u003cp\u003eFor fridge locations that require a more involved water supply route, including difficult access, long pipe runs or plumbing outside a standard kitchen layout.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMay include:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eWater supply from another suitable plumbing location\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eExtended water line installation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eExternal pipework where appropriate\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eUnderfloor or subfloor routing where accessible\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eMultiple wall or cabinetry penetrations\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDifficult ceiling access\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFridge locations separated from the main kitchen plumbing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eAdditional isolation valves or plumbing alterations\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection and testing of customer-supplied fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBest for:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eFridges located remotely from the kitchen sink\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLarge kitchens with no simple water route\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eIsland fridge installations\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDouble-storey or difficult-access homes\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eProperties requiring significant new pipework\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eInstallations that do not fit one of the standard options above\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eComplex installations may require photos or an onsite assessment before the final scope and price can be confirmed.\u003c\/strong\u003e\u003c\/p\u003e\n\u003chr\u003e\n\u003ch1\u003eBooking Timeframe Options\u003c\/h1\u003e\n\u003cp\u003eChoose how quickly you would like your fridge water installation completed:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eWithin 1 Business Day — Priority Service\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eWithin 5 Business Days — Standard Booking\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eWithin 20 Business Days — Flexible Booking\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eBooking timeframes are based on business days and exclude weekends and public holidays.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch1\u003eWhat's Included\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eLicensed plumber\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eTravel within applicable Brisbane \u0026amp; Gold Coast service areas\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFridge water installation based on your selected option\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStandard plumbing fittings and connection materials\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDedicated isolation valve where included in selected scope\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConnection of customer-supplied fridge\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater pressure and flow check\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eLeak testing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic operation check of fridge water supply\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBasic clean-up after installation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch1\u003eWhat's Not Included\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eSupply of refrigerator\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eRefrigerator repairs or appliance fault diagnosis\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eElectrical work or installation of power points\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eStone, engineered stone, porcelain or masonry benchtop drilling\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eCabinetmaking, joinery or major cabinetry modifications\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003ePlastering, painting or wall repairs\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eTile removal or replacement\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eConcrete cutting\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eTrenching or excavation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eRemoval of flooring\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eDifficult or inaccessible ceiling entry\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWork requiring asbestos disturbance\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eAdditional plumbing outside the selected installation option\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWater filtration systems unless specifically selected or quoted\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eRepairs to defective or non-compliant existing plumbing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch1\u003eService Conditions\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003eRefrigerator must be customer supplied and onsite at the time of installation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFridge must be designed for connection to a mains water supply\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eAppliance connection requirements must be compatible with the available water supply\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eKitchen cupboards and plumbing routes must be reasonably accessible\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eCustomer must ensure the refrigerator fits the allocated fridge cavity\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eExisting plumbing must be suitable and compliant for connection\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eCeiling-space installations require safe and practical roof-space access\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eJR Gas \u0026amp; Water does not drill stone or engineered stone surfaces\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFurniture, stored items and cupboard contents must be removed where access is required\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eIf the actual installation differs significantly from the selected option, we will explain the additional work before proceeding\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eWork will only proceed where it can be completed safely and compliantly\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch1\u003eWhich Option Should I Choose?\u003c\/h1\u003e\n\u003cp\u003e\u003cstrong\u003eWater point already behind the fridge?\u003c\/strong\u003e\u003cbr\u003eChoose \u003cstrong\u003eExisting Fridge Water Point — Connection Only\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSink and fridge are on the same straight cupboard run?\u003c\/strong\u003e\u003cbr\u003eChoose \u003cstrong\u003eNew Water Line — From Sink on Same Cupboard Run\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFridge is further around the kitchen but cupboards or walls provide a usable route?\u003c\/strong\u003e\u003cbr\u003eChoose \u003cstrong\u003eNew Water Line — Extended Cabinet \/ Wall Route\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe water line needs to travel above the kitchen through the roof space?\u003c\/strong\u003e\u003cbr\u003eChoose \u003cstrong\u003eNew Water Line — Through Ceiling Space\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIsland fridge, difficult access or no obvious route?\u003c\/strong\u003e\u003cbr\u003eChoose \u003cstrong\u003eComplex Fridge Water Line Installation\u003c\/strong\u003e.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch1\u003eBest For\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003ePlumbed refrigerator installation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFridge water dispensers\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eAutomatic ice makers\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eNew fridge water points\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eReplacement refrigerator connections\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eKitchen renovations\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eExisting kitchens without fridge plumbing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eFridge isolation valve installations\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003eBrisbane and Gold Coast fridge plumbing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch1\u003eFAQs\u003c\/h1\u003e\n\u003ch2\u003eDo I need to supply the fridge?\u003c\/h2\u003e\n\u003cp\u003eYes. This service is for customer-supplied refrigerators.\u003c\/p\u003e\n\u003ch2\u003eI already have a water point behind the fridge. Which option do I choose?\u003c\/h2\u003e\n\u003cp\u003eChoose \u003cstrong\u003eExisting Fridge Water Point — Connection Only\u003c\/strong\u003e. This is designed for straightforward connection of a new fridge to an existing suitable water point.\u003c\/p\u003e\n\u003ch2\u003eCan you run the water from underneath my kitchen sink?\u003c\/h2\u003e\n\u003cp\u003eYes. If the sink and refrigerator are on the same accessible cupboard run, choose \u003cstrong\u003eNew Water Line — From Sink on Same Cupboard Run\u003c\/strong\u003e.\u003c\/p\u003e\n\u003ch2\u003eWhat if the fridge is on the other side of the kitchen?\u003c\/h2\u003e\n\u003cp\u003eIf there is no suitable cabinet route, the water line may be able to run through the ceiling space. Choose \u003cstrong\u003eNew Water Line — Through Ceiling Space\u003c\/strong\u003e if the property has suitable access.\u003c\/p\u003e\n\u003ch2\u003eCan you run a water line to a fridge in an island?\u003c\/h2\u003e\n\u003cp\u003ePotentially, but island installations can require access beneath the floor, through cabinetry or during construction. Select \u003cstrong\u003eComplex Fridge Water Line Installation\u003c\/strong\u003e so the route can be assessed.\u003c\/p\u003e\n\u003ch2\u003eIs an isolation valve included?\u003c\/h2\u003e\n\u003cp\u003eA dedicated fridge isolation valve is included with new water-line installation options where required. Existing-point connections use the existing isolation where it is suitable.\u003c\/p\u003e\n\u003ch2\u003eDo you check the water pressure?\u003c\/h2\u003e\n\u003cp\u003eYes. We check the available water supply and pressure as part of the installation and test the completed connection for leaks.\u003c\/p\u003e\n\u003ch2\u003eCan you install a fridge filter?\u003c\/h2\u003e\n\u003cp\u003eYes, but external or additional filtration systems should be selected separately or quoted where required.\u003c\/p\u003e\n\u003ch2\u003eCan you drill through my kitchen cabinets?\u003c\/h2\u003e\n\u003cp\u003eStandard penetrations through suitable timber or laminate cabinetry can be completed where required for the selected installation. We do \u003cstrong\u003enot\u003c\/strong\u003e drill stone, engineered stone or similar surfaces.\u003c\/p\u003e\n\u003ch2\u003eWhat happens if I choose the wrong installation option?\u003c\/h2\u003e\n\u003cp\u003eIf the site differs from the option selected, we will identify what is required and explain any additional work or pricing before proceeding.\u003c\/p\u003e","brand":"JR Gas \u0026 Water","offers":[{"title":"Existing Fridge Water Point — Connection Only \/ Within 20 business days","offer_id":46086852608191,"sku":null,"price":299.0,"currency_code":"AUD","in_stock":true},{"title":"Existing Fridge Water Point — Connection Only \/ Within 5 business days","offer_id":46086852640959,"sku":null,"price":399.0,"currency_code":"AUD","in_stock":true},{"title":"Existing Fridge Water Point — Connection Only \/ Within 1 business day","offer_id":46086852673727,"sku":null,"price":499.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — From Sink on Same Cupboard Run \/ Within 20 business days","offer_id":46086852706495,"sku":null,"price":499.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — From Sink on Same Cupboard Run \/ Within 5 business days","offer_id":46086852739263,"sku":null,"price":599.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — From Sink on Same Cupboard Run \/ Within 1 business day","offer_id":46086852772031,"sku":null,"price":699.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Extended Cabinet \/ Wall Route \/ Within 20 business days","offer_id":46086852804799,"sku":null,"price":699.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Extended Cabinet \/ Wall Route \/ Within 5 business days","offer_id":46086852837567,"sku":null,"price":799.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Extended Cabinet \/ Wall Route \/ Within 1 business day","offer_id":46086852870335,"sku":null,"price":899.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Through Ceiling Space \/ Within 20 business days","offer_id":46086890193087,"sku":null,"price":1099.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Through Ceiling Space \/ Within 5 business days","offer_id":46086890225855,"sku":null,"price":1199.0,"currency_code":"AUD","in_stock":true},{"title":"New Water Line — Through Ceiling Space \/ Within 1 business day","offer_id":46086890258623,"sku":null,"price":1299.0,"currency_code":"AUD","in_stock":true},{"title":"Complex Fridge Water Line Installation \/ Within 20 business days","offer_id":46086890291391,"sku":null,"price":1599.0,"currency_code":"AUD","in_stock":true},{"title":"Complex Fridge Water Line Installation \/ Within 5 business days","offer_id":46086890324159,"sku":null,"price":1699.0,"currency_code":"AUD","in_stock":true},{"title":"Complex Fridge Water Line Installation \/ Within 1 business day","offer_id":46086890356927,"sku":null,"price":1799.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0049\/3168\/2415\/files\/fridge-with-water-dispenser-in-nice-hamptons-styel-kitchen-view-from-across-room.png?v=1777415895","url":"https:\/\/www.jrgasandwater.com.au\/products\/fridge-water-line-installation-connection","provider":"JR Gas and Water","version":"1.0","type":"link"}